SSB Exim Services Rural Godowns / Warehouses
NABARD – Rural Godowns Scheme Overview
 Sl No Particulars Details
1 Scheme Name NABARD (Rural Godowns Scheme)
2 Scheme Period Extended up to 31.03.2026
3 Type of Godown Only New Godowns (Renovation of Godown and Existing Godowns are not allowed for subsidy)
4 Subsidy Amount General Category 25% of Capital Cost, Max cap of Rs. 37.5 Lakhs
SC / ST / Women Entrepreneur 33.33% of Capital Cost, Max cap of Rs. 50 Lakhs
5 Type of Subsidy Credit Linked Back ended
6 No. of Instalments Two (2) Equal Instalments (50% & 50%)
7 MT allowed Minimum MT: 1000 MT, Maximum MT: 5000 MT
8 Components Allowed Only Agri / Horti commodities are allowed for subsidy
Storage Infrastructure: It Includes like godowns including stand-alone silos for storage of food grains with necessary ancillary facilities like loading, unloading, bagging facility, etc.
Allied Facilities: Assistance for storage infrastructure will be available on Capital Cost of the project including cost of allied facilities like Boundary Wall, Internal Road, Internal Drainage System, Weighing, Grading, Packing, Quality testing and Certification, firefighting equipment, etc. which are functionally required to operate the project.
9 Technical Specifications Godown should be build as per specifications prescribed by Negotiable Warehousing Receipt System (NWRS) and Warehousing Development and Regulatory Authority (WDRA).
Conditions For Availing Subsidy:
1 Term Loan (TL) 1. Minimum 50% of the Project Cost (Including Subsidy Amount). 2. Any investment made by the promoter before sanction of Term Loan will not eligible for the subsidy
2 Promoter Contribution Minimum 20% of the Project Cost.
3 Land / Lease 1. Land should be in the Name of Applicant. 2. In case of lease land, Lease Period should be minimum for 15 Years
4 Capacity of Rural Godowns 1. It will be calculated @ 1.8 MT per square meter of floor area for projects having average height of 4.5 meter and above. 2. The height of the storage infrastructure will be measured from the floor level to the bottom of the truss.
5 When to start Implementation Project should be implemented after the sanction of Term Loan only.
6 When to Finish the Project Within 18 Months from the date of first disbursement of Term Loan.
7 Inspections by Department One-Time Inspection